How to Compare Bathroom Remodel Bids

Bathroom bids almost never include the same things. The most important difference — waterproofing — is invisible in the finished product and expensive when it's missing.

🔍

Have bathroom bids to compare?

BidLens checks waterproofing spec, tile substrate, scope gaps, and payment terms — free.

Compare my bathroom bids free →
1

Verify waterproofing system for each bid

This is the single most important comparison point. Ask each contractor: "What waterproofing membrane are you installing in the shower?" Only accept specific answers: RedGard, Schluter Kerdi, WEDI. A bid without this is quoting an inferior product regardless of its total price.

2

Get tile spec from every contractor

Tile is 20–35% of a bathroom budget and the most variable line item. From each bid, extract: tile type (porcelain/ceramic/natural stone), size, brand/series, and sqft for floor vs. walls separately. A bid that says "tile floors and walls" is not a spec. Compare like for like — same tile type and quality across all bids.

3

Confirm shower valve brand and model

IRC requires pressure-balancing or thermostatic shower valves. Ask each contractor the specific valve brand and model. Moen Posi-Temp, Kohler Rite-Temp, Delta Monitor are the standards. No-brand or unspecified valves fail faster and are harder to repair. This is a quality signal, not a cost signal.

4

Check what scope each bid includes vs. excludes

Most variable items: demo (included vs. add-on), permits (included vs. excluded), exhaust fan (new vs. reuse existing), vanity and fixtures (specified vs. allowance), accessories (towel bars, mirror, etc). Create a line-by-line checklist and mark each bid. Adjust totals for any exclusions before comparing numbers.

5

Confirm timeline and cure time plan

A realistic full-tile bathroom remodel takes 3–4 weeks minimum. Ask each contractor: "What is your cure time plan between waterproofing, tile, and grout?" A contractor who answers specifically (24-48 hours between layers) is doing the job correctly. One who says "about a week" is rushing.

6

Compare payment schedule and permit plan

Standard: 10–20% deposit, progress payments, final after punch list. Confirm each contractor pulls required permits — any bid that excludes permits will add them as a change order. Ask for permit responsibility in writing.

BidLens compares bathroom bids automatically

Upload your bids and BidLens checks waterproofing system, tile spec, scope gaps, and payment schedule across all bids simultaneously.

Compare my bathroom bids free →

Frequently Asked Questions

Why do bathroom remodel bids vary so much?+
Bathroom bids vary because: (1) tile type and quality is often unspecified, spanning $5–$60/sqft installed; (2) waterproofing system is frequently omitted from lower bids; (3) fixture quality is rarely specified (toilet brand, faucet brand, shower valve); (4) scope often differs — some bids include demo and permits, others exclude both. You cannot compare totals without first standardizing all of these.
What is the most important thing to compare across bathroom bids?+
Waterproofing system. Ask each contractor: "What waterproofing membrane are you using behind the shower tile?" Accept only a specific product name: RedGard, Schluter Kerdi, WEDI, or equivalent. A bid that includes proper waterproofing is not comparable to one that does not — the failure cost of the second bid is $5,000–$30,000 in future remediation.